1. Which of the following is not a primary component of a power system?
A) Transmission line
B) Circuit breaker
C) Transformer
D) Generator
Answer: B) Circuit breaker
2. The power generated by a synchronous generator is given by:
A) V × I
B) VI cos θ
C) V^2 / R
D) V^2 / X
Answer: B) VI cos θ
3. The per-unit system in power system analysis is used to:
A) Standardize the units of measurement
B) Simplify complex power calculations
C) Calculate fault currents
D) Determine transformer turns ratio
Answer: A) Standardize the units of measurement
4. The swing equation in power systems describes the dynamics of:
A) Generator rotor angle
B) Fault current magnitude
C) Line charging capacitance
D) Transformer impedance
Answer: A) Generator rotor angle
5. In a power system, the term ‘load flow’ refers to:
A) Distribution of load among generators
B) Steady-state solution of nodal voltages and power flows
C) Maximum power transfer theorem
D) Reactive power compensation
Answer: B) Steady-state solution of nodal voltages and power flows
6. Which of the following is used to protect a generator during faults?
A) Overcurrent relay
B) Differential relay
C) Distance relay
D) Directional relay
Answer: B) Differential relay
7. The concept of ‘reactive power’ in a power system refers to:
A) Power factor correction
B) Real power consumed by loads
C) Power used for mechanical work
D) Volt-amperes reactive exchanged in the system
Answer: D) Volt-amperes reactive exchanged in the system
8. The primary purpose of a transformer in a power system is to:
A) Change the frequency of the voltage
B) Convert electrical energy into mechanical energy
C) Step up or step down voltage levels
D) Provide backup power during outages
Answer: C) Step up or step down voltage levels
9. Which of the following is NOT a type of fault in power systems?
A) Phase-to-phase fault
B) Line-to-line fault
C) Open circuit fault
D) Parallel fault
Answer: D) Parallel fault
10. The admittance matrix in power system analysis represents:
A) Bus voltages and currents
B) Branch impedances and power flows
C) Generator characteristics
D) Transformer turns ratio
Answer: B) Branch impedances and power flows
11. A synchronous condenser is used in power systems to:
A) Generate real power
B) Provide reactive power support
C) Step up voltage levels
D) Control system frequency
Answer: B) Provide reactive power support
12. The phenomenon of ‘voltage collapse’ in a power system is primarily caused by:
A) Overvoltage conditions
B) Lack of reactive power
C) Short circuit faults
D) Generator tripping
Answer: B) Lack of reactive power
13. The power transfer capability of a transmission line is primarily limited by its:
A) Resistance
B) Inductance
C) Capacitance
D) Thermal rating
Answer: D) Thermal rating
14. The concept of ‘steady-state stability’ in power systems refers to the system’s ability to:
A) Maintain nominal voltage levels
B) Withstand sudden load changes
C) Return to equilibrium after a disturbance
D) Synchronize generator frequencies
Answer: C) Return to equilibrium after a disturbance
15. The purpose of load shedding in a power system is to:
A) Reduce generator output
B) Maintain system frequency
C) Increase system losses
D) Improve power factor
Answer: B) Maintain system frequency
16. In power system protection, a ‘relay’ is used to:
A) Control generator output
B) Monitor system voltages
C) Detect and isolate faults
D) Regulate transformer taps
Answer: C) Detect and isolate faults
17. The Bus Impedance Matrix (BIM) in power system analysis is used to:
A) Calculate fault currents
B) Solve load flow equations
C) Determine transmission line losses
D) Model synchronous generators
Answer: B) Solve load flow equations
18. The primary function of a circuit breaker in a power system is to:
A) Control reactive power flow
B) Switch off during overvoltage conditions
C) Interrupt fault currents
D) Adjust line impedance
Answer: C) Interrupt fault currents
19. Which parameter is not considered in the load flow analysis?
A) Real power demand
B) Reactive power demand
C) Short-circuit current
D) Transmission line losses
Answer: C) Short-circuit current
20. The concept of ‘system stability’ in power systems relates to the:
A) Ability to control system frequency
B) Resilience against voltage fluctuations
C) Prevention of cascading failures
D) Maintenance of steady-state conditions
Answer: D) Maintenance of steady-state conditions
21. In power system economics, the ‘merit order dispatch’ refers to:
A) Scheduling of generator maintenance
B) Prioritizing generation based on cost
C) Calculation of line losses
D) Optimization of transmission routes
Answer: B) Prioritizing generation based on cost
22. The term ‘voltage regulation’ in power systems refers to the ability to:
A) Control reactive power flow
B) Maintain constant voltage levels
C) Synchronize generator frequencies
D) Manage power factor
Answer: B) Maintain constant voltage levels
23. The ‘load angle’ in a synchronous generator indicates the phase difference between:
A) Rotor speed and stator frequency
B) Real power and reactive power
C) Generator terminals and bus voltages
D) Generator internal voltage and external load
Answer: D) Generator internal voltage and external load
24. The term ‘fault current’ in power systems refers to:
A) Excessive reactive power
B) Excess real power demand
C) Current flow during a fault condition
D) Capacitor switching transient
Answer: C) Current flow during a fault condition
25. The purpose of ‘reactive power compensation’ in power systems is to:
A) Increase real power generation
B) Stabilize system voltage
C) Reduce transmission losses
D) Minimize fault currents
Answer: B) Stabilize system voltage
26. In power system protection, the ‘permissive overreach’ principle is used to:
A) Coordinate relay operations
B) Minimize fault clearance time
C) Mitigate transformer failures
D) Improve generator efficiency
Answer: A) Coordinate relay operations
27. The term ‘transient stability’ in power systems refers to the system’s ability to:
A) Return to steady state after a disturbance
B) Prevent voltage fluctuations
C) Control reactive power flow
D) Handle sudden load changes
Answer: A) Return to steady state after a disturbance
28. A ‘load tap changer’ (LTC) in a transformer is used to:
A) Step up or step down voltage
B) Control reactive power flow
C) Adjust transformer taps automatically
D) Improve power factor
Answer: C) Adjust transformer taps automatically
29. The primary purpose of ‘power factor correction’ equipment in power systems is to:
A) Reduce real power losses
B) Improve generator efficiency
C) Eliminate reactive power consumption
D) Stabilize system frequency
Answer: A) Reduce real power losses
30. The term ‘resilience’ in power systems refers to the ability to:
A) Withstand natural disasters
B) Minimize line losses
C) Handle sudden load changes
D) Maintain steady-state conditions
Answer: A) Withstand natural disasters
31. In power system operation, ‘AGC’ stands for:
A) Automatic Generator Control
B) Active Grid Connection
C) Adaptive Generator Control
D) Advanced Grid Configuration
Answer: A) Automatic Generator Control
32. The ‘short-circuit ratio’ of a synchronous generator indicates its:
A) Reactance to resistance ratio
B) Maximum power output
C) Fault clearing time
D) Ability to supply fault current
Answer: D) Ability to supply fault current
33. The ‘swing bus’ in a power system is typically associated with:
A) Heavy industrial loads
B) Controlling system frequency
C) Connecting to the grid
D) Monitoring load flow
Answer: B) Controlling system frequency
34. The term ‘load shedding’ in power systems refers to the deliberate:
A) Disconnection of non-critical loads
B) Reduction of generator output
C) Increase in transmission line capacity
D) Optimization of power flows
Answer: A) Disconnection of non-critical loads
35. The term ‘symmetrical components’ in power systems analysis is used to analyze:
A) Balanced three-phase faults
B) Unbalanced load conditions
C) Transformer impedance
D) Generator characteristics
Answer: B) Unbalanced load conditions
36. The primary function of a ‘reactor’ in power systems is to:
A) Step up or step down voltage
B) Control real power flow
C) Limit fault currents
D) Provide backup power
Answer: C) Limit fault currents
37. The ‘steady-state voltage stability limit’ of a power system is primarily affected by:
A) Transmission line losses
B) Generator capacities
C) Reactive power reserves
D) Load characteristics
Answer: C) Reactive power reserves
38. The ‘sensitivity factor’ in power system stability analysis indicates the:
A) Rate of change of system frequency
B) Impact of parameter variations on stability
C) Fault current magnitude
D) Efficiency of reactive power compensation
Answer: B) Impact of parameter variations on stability
39. In power system protection, ‘zone of protection’ refers to the:
A) Geographic coverage of a generator
B) Range within which a relay operates
C) Load distribution across the network
D) Fault current magnitude
Answer: B) Range within which a relay operates
40. The ‘synchronous machine’ in power systems is typically used to:
A) Convert mechanical energy to electrical energy
B) Control system frequency
C) Store excess power
D) Regulate line voltages
Answer: A) Convert mechanical energy to electrical energy
41. The term ‘load factor’ in power systems refers to the ratio of:
A) Peak demand to average demand
B) Real power to reactive power
C) Maximum load to minimum load
D) Voltage to current
Answer: C) Maximum load to minimum load
42. The ‘reactive power capability’ of a generator refers to its ability to:
A) Supply real power during peak demand
B) Absorb excess reactive power
C) Generate or absorb reactive power
D) Improve system power factor
Answer: C) Generate or absorb reactive power
43. The ‘fault clearing time’ in power systems refers to the duration taken to:
A) Detect a fault
B) Isolate a faulted section
C) Return to normal operation after a fault
D) Restore power to affected areas
Answer: B) Isolate a faulted section
44. The concept of ‘grid code’ in power systems pertains to:
A) Safety regulations for transmission lines
B) Standards for grid integration of generators
C) Economic dispatch of power
D) Load shedding procedures
Answer: B) Standards for grid integration of generators
45. The ‘slack bus’ in a power system is associated with:
A) High voltage transmission lines
B) Controlling real power flow
C) Maintaining system frequency
D) Reference voltage for load flow analysis
Answer: D) Reference voltage for load flow analysis
46. The ‘line drop compensation’ in power systems is used to:
A) Reduce transmission losses
B) Improve generator efficiency
C) Minimize fault currents
D) Control system frequency
Answer: A) Reduce transmission losses
47. The ‘protection relay coordination’ in power systems ensures:
A) Minimal generator losses
B) Rapid fault detection and clearance
C) Maximum power transfer
D) Efficient reactive power compensation
Answer: B) Rapid fault detection and clearance
48. The ‘critical clearing time’ in power system stability analysis refers to:
A) Time to restore power after an outage
B) Duration for load shedding activation
C) Maximum time to clear a fault
D) Minimum time to stabilize frequency
Answer: C) Maximum time to clear a fault
49. The term ‘generator dispatch’ in power systems refers to the:
A) Control of active power output
B) Maintenance scheduling
C) Grid integration standards
D) Optimization of line losses
Answer: A) Control of active power output
50. The ‘voltage stability margin’ in power systems indicates:
A) Tolerance to voltage fluctuations
B) Ability to regulate system frequency
C) Reserve capacity for reactive power
D) Security of supply during peak demand
Answer: C) Reserve capacity for reactive power
More MCQs on Electrical Engineering (Power) MCQs
- Power System Instrumentation
- Optimization Techniques in Power Systems MCQs
- Computational Methods in Power Engineering MCQs
- Computational Methods MCQs
- HVDC (High Voltage Direct Current) Systems MCQs
- Electric Vehicles and Charging Infrastructure MCQs
- Battery Storage Systems MCQs
- Power Emerging Technologies MCQs
- Distributed Generation MCQs
- Microgrid Design and Control MCQs
- Smart Grids and Microgrids MCQs
- Transformers MCQs
- Advanced Electrical Machines MCQs
- Electrical Machine Design MCQs
- Electrical Machines MCQs
- Demand Side Management MCQs
- Energy Efficiency and Audits MCQs
- Energy Management Systems MCQs
- Energy Management and Systems MCQs
- Electric and Magnetic Field Analysis MCQs
- Electromagnetisc Compatibility MCQ
- Electromagnetic Fields and Applications MCQs
- Grid-Connected Renewable Energy Systems MCQs
- Integration of Renewable Energy Systems MCQs
- Renewable Energy Integration MCQs
- Advanced Control Techniques MCQs
- Digital Control Systems MCQs
- Industrial Control Systems MCQs
- Automatic Control Systems MCQs
- Power Semiconductor Devices MCQs
- Switching Power Supplies MCQs
- Electric Drives MCQs
- Power Electronics MCQs
- Power Quality MCQs
- Fault Analysis MCQs
- Load Flow Analysis MCQs
- Power System Stability and Control MCQs
- Power System Analysis MCQs
- Smart Grids MCQs
- Power System Protection and Relaying MCQs
- Distribution Systems MCQs
- Transmission Line Theory MCQs
- High Voltage Engineering MCQs
- Geothermal MCQs
- Biomass MCQs,
- Wind MCQs,
- Solar energy MCQs
- Renewable Energy Sources MCQs
- Hydro power MCQs )
- Nuclear power MCQs,
- Thermal power MCQs,
- Conventional Power Generation MCQs
- Electrical Engineering (Power) MCQs